There is a high probability that you can generate more profit from your power station

Steam and Auxiliary Products would like to help you to examine the issues surrounding critical valve applications in CCGT power plants, in particular plants with Alstom GT 24 and GT 26 turbines.

We look at the causes of common issues and then discuss innovative, proven solutions.

What we would like to do for your installation and how:

  • We would like to help you to improve the total efficiency of your installation and to reduce maintenance and operational costs.
  • We would like to help you to go through your system and
    review your design and current parameters, operational hours and hardware.
  • Based on the information gathered we will be able to provide you with proposals for improvements.

 

The annual financial benefits can vary from relatively small to substantial. However, even smaller benefits can make a substantial contribution to your profitability, especially when keeping in mind that these benefits will be there year after year.

To give you an idea of the annual benefits that can be obtained we have listed a few examples below. These are based on a power station with a capacity of about 900MW.

DESUPERHEATERS (SYSTEM)

Potential Annual Benefit: $80,000 to $110,000. Payback in approximately four months.

Cooled High Cycle Desuperheater

MAIN STEAM STOP AND CHECK VALVES

Potential Annual Benefit: $120,000 to $150,000. Payback in approximately eight months.

main steam stop valve

SUPERHEATER DRAIN SYSTEM

Potential Annual Benefit: $80,000 to $100,000. Payback in approximately three months.

superheater drain system

ONCE THROUGH COOLER

Potential Annual Benefit: $5000 per start. Payback in approximately three months.

once through cooler